PROJECT CARGO & BREAKBULK
Project Cargo & Breakbulk from China
Project-specific coordination for heavy, oversized and non-containerized cargo, from origin preparation and handling through international transport.
Dimensions. Weight. Route. Handling. The plan starts with your cargo.

PROJECT-SPECIFIC CARGO
When standard freight is not enough.
Cargo dimensions, weight, packing, handling method and route are reviewed for each shipment.
Large Dimensions
Heavy Individual Pieces
Non-standard Loading
Breakbulk Requirements
Special Handling / Lifting Requirements
Multiple Transport Stages
CARGO & HANDLING
Cargo that requires closer planning.
Heavy Equipment
Individual pieces where weight, access and handling need a closer review.
Industrial Machinery
Equipment requiring careful packing review and coordinated handovers.
Oversized Cargo
Pieces whose packed dimensions affect the route, loading and equipment choice.
Steel & Breakbulk Cargo
Steel and industrial cargo requiring a cargo-specific handling approach.
Non-containerized Cargo
Shipments reviewed for transport outside a standard container arrangement.
Project Equipment
Related equipment and pieces coordinated across multiple handling stages.
Transport equipment and loading method are selected after reviewing the cargo dimensions, weight, packing, route and handling requirements.
Discuss Heavy Equipment →PROJECT SCOPE
What DGA coordinates for project cargo
Confirm where coordination starts, the handling stages required and what is included in the agreed scope.
Cargo & Route Review
Review the available cargo details, route and transport constraints.
Origin Pickup Coordination
Coordinate collection around cargo readiness, site access and agreed handling.
Packing / Cargo Preparation
Review packing status and coordinate required protection or preparation.
Loading Plan Coordination
Bring cargo, access and handling requirements into the loading discussion.
Export Customs Preparation
Coordinate shipment details and supporting export documents.
Port / Terminal Handling Coordination
Review port and terminal requirements where applicable.
International Transport Coordination
Coordinate the confirmed ocean or other international transport arrangement.
Destination Handling / Delivery Coordination
Review and arrange only the destination scope confirmed for the specific shipment.
HOW IT WORKS
One project. Multiple handling stages.
The sequence and responsibilities are confirmed around the cargo and agreed project scope.

- 01
Share Cargo Information
Start with the description, photos and the details already available.
- 02
Review Dimensions, Weight & Route
Review packed measurements, piece weights, origin and destination.
- 03
Confirm Handling Requirements
Clarify access, packing, loading and any lifting information available.
- 04
Prepare / Pick Up Cargo
Coordinate the agreed cargo preparation and origin pickup.
- 05
Arrange Export & Loading
Coordinate export documents, handling and the confirmed loading arrangement.
- 06
International Transport
Follow the agreed international transport plan and handover requirements.
- 07
Arrival / Destination Coordination
Coordinate the destination tasks included in the confirmed project scope.
PROJECT REVIEW
Start with the cargo details.
Share what you know. Missing details can be clarified during the review; you do not need to select a vessel or know every handling requirement.
Cargo & Measurements
- Cargo / equipment description
- Quantity
- Packed dimensions per piece
- Packed weight per piece
- Packing status
Route & Readiness
- Origin / pickup location
- Destination
- Cargo ready date
- Preferred transport mode, if known
- Special cargo status
Photos & Documents
- Cargo photos
- Packing list and supporting documents
- Drawings, if available
- Handling / lifting notes, if available
- Lifting points or center of gravity, if available
Measurements for each major piece.
For each major piece, share the packed length, width, height and weight where available. Handling methods and transport options are reviewed after receiving the available cargo information.

AT ORIGIN
Prepare cargo before the main transport.
Confirm the origin tasks before the cargo moves to its next handling stage.
- Supplier / site pickup
- Packing review and cargo photos
- Repacking / protection, where required
- Loading coordination
- Export customs preparation
- Handover coordination
BREAKBULK & HEAVY CARGO
Handling planned around the cargo.
Equipment, packing, access and the available handling arrangements shape each project discussion.

Heavy Equipment
Review individual pieces, packing and handling needs before confirming the transport arrangement.
Discuss Heavy Equipment →
Steel & Breakbulk
Coordinate non-containerized and industrial cargo around the route and the handling requirements of each shipment.
Discuss Breakbulk Cargo →Destination handling and delivery requirements are reviewed for each project based on the cargo, port, route and local operating conditions.
REAL PROJECT OPERATIONS
Real cargo. Real project handling.
Selected photographs from DGA’s supplied project and cargo-operation materials.





PROJECT CARGO QUESTIONS
Before we plan.
What information do you need to review project cargo?
Share the cargo description, quantity, packed dimensions and weight per piece where available, packing status, origin, destination and ready date. Cargo photos, drawings and handling notes help the review. If you do not have every detail, start with what is available.
Can DGA handle oversized or heavy equipment?
DGA can review heavy and oversized equipment for project-specific transport and handling coordination. Options depend on the dimensions, weight, packing, route, local operating conditions and carrier availability. Acceptance and the scope are confirmed for each shipment.
Can project cargo move as breakbulk?
Breakbulk may be reviewed for cargo that does not suit a standard container arrangement. The transport equipment and loading method are selected after reviewing the cargo, route, handling requirements and available transport options.
Can DGA coordinate packing and loading at origin?
DGA can coordinate packing review, required cargo preparation and loading at origin within the agreed scope. Share photos, the packing status and any available handling or lifting notes so the practical requirements can be reviewed.
Can you help with export customs for project cargo?
DGA can coordinate export customs preparation and shipping document support. Requirements depend on the cargo, export documentation and applicable regulations; customs approval is not guaranteed.
Do you arrange destination unloading or delivery?
Destination handling and delivery requirements are reviewed for each project based on the cargo, port, route and local operating conditions. Only the destination services specifically confirmed for the shipment are included.
How do you decide which transport method to use?
Transport and handling options depend on cargo dimensions, weight, packing, route, destination requirements and carrier availability. Share the information you have; you do not need to select a vessel or transport equipment in advance.
DISCUSS YOUR PROJECT
Tell us about the cargo that needs a project plan.
Share the cargo dimensions, weight, origin, destination and available photos or drawings so the handling and transport requirements can be reviewed.
Online submission is not enabled. Prepare and check your details here, then contact DGA on WhatsApp.
Chat on WhatsApp →This form collects details for a conversation. It does not approve cargo, calculate a route, create a lifting plan or generate a quotation. Files remain on your device.
* Required for the local check. Optional details can be clarified later. Up to 5 files in total, 10 MB each: PDF, JPG, PNG, WebP, spreadsheet or document formats.
Nothing has been submitted or uploaded. Online submission is not enabled.
